The project consisted of 450 linear metres of natural oak veneered board in the balcony balustrades, all finished with solid oak capping.
The five stair/lift cores on all four floors were finished with continuously slotted laminated fire rated boards, all in individual colours. This totalled 1400m².
The chamber was the “pièce de résistance “with oak veneered absorption boards on the external walls, and a curved balustrade, all other finishing joinery was included in the project.
All works were supplied and installed by Accordial® working in conjunction with the architects Cartwright Pickard.