Construction

Automotive

Engineering

Resources

About Us

TECHNICAL SUPPORT:
EMAIL US:
FOLLOW US:

Silence is Golden at Doncaster Civic Centre

The project consisted of 450 linear metres of natural oak veneered board in the balcony balustrades, all finished with solid oak capping.

The five stair/lift cores on all four floors were finished with continuously slotted laminated fire rated boards, all in individual colours.  This totalled 1400m².

The chamber was the “pièce de résistance “with oak veneered absorption boards on the external walls, and a curved balustrade, all other finishing joinery was included in the project.

All works were supplied and installed by Accordial® working in conjunction with the architects Cartwright Pickard.