They not only changed the name of the new upgraded training complex at Carrington, the whole pavilion was transformed into a state of the art facility.
Within the new building is a relaxing area which has the ability to form a combination of different rooms depending on the need thanks to the installation of two Accordial® PremierWalls.
Sound transfer was reduced with two 57dB PremierWalls, one being faceted with eleven panels and two pass doors.
With the use of both walls two meeting rooms are formed with a corridor between.
Both were finished in Walnut Crown veneer with a Wenge inlay.
All of the panels can be stacked away in four corners to give maximum open floor space.