|
What the contractors say
Contractors who have used the system have been loud in their
praise. Sean Partridge Managing Director of S&G Roofing comments
The Ashzip full height halter is the design of the century
it obliterates all other competition. The setting out template
makes installation really simple. It also saves a lot of time
and money through positioning accuracy compared to using a
bar and bracket system in conjunction with a standard halter
bracket. |
|
|
Adam Johnson, Contracts Director with Leicester based Torclad,
said We used the full height halters on the Meadows Community
School project and found two main advantages. Firstly, it
takes the inaccuracy out of standing seam as there are less
components and less risk for poor tolerances. Secondly, it
is speed again less components so it is more user friendly.
Download Ashzip brochure
 |
|
|