The Bishop of Hereford’s Bluecoat School
Problem:
The existing flat roof was constructed in
1974 and had reached the end of its design
life. It was leaking badly and internal valley
gutters were compounding the problem
further.
Solution:
An Ashjack propped rafter over-roof
conversion system was used to create a
pitched roof structure to facilitate run-off
and the internal valley gutters were
replaced with external gutters. Sun pipes
were installed to compensate for the loss of
around 60 skylights in the original flat roofs.

|